School Case Study

School Case Studies 1

School saves 84% more CO2 than old boiler

Project
  • Heated floor area: 2,700 m2
  • Heating demand: 1.000.000 kWh · a
Solution
School Case Studies 2
Indoor unit: 3x Thermia Mega XL
School Case Studies 3
Plantroom: 2x Water tank 750 l.
  • No Radiators Upgrade
  • No Insulation Upgrade
  • No distribution pipework
  • Old Wood pellet boiler replaced by Thermia Heat Pump
Economics
School Case Studies 4
 Savings: €19,692